• YouTube Twitter/XTwitter/X Instagram Facebook
  • Office Locations Contact Us
/ Categories: Correspondence, Tax

Demand Notice

Delinquency Notice

Why was this letter sent to me?

This letter was sent to you because you did not submit your quarterly wage report for the most recently completed quarter.

What does this letter mean?

This letter means that your Employer and Wage Detail Report for the quarter listed in the letter is due. You should file a report even if you had no employees or paid no wages during that quarter. Interest will continue to accrue until you make the payment.

What do I do next?

You should log in to your account online to at www.dws.state.nm.us to file your Employer and Wage Detail Report. If you do not file within fifteen (15) days from the date of this notice, the department may generate and apply an estimation of your wages. That estimation, according to department regulations, will be 150% of the highest quarter in the past eight quarters reported by you.

Where am I in the claims or tax process?

You are in the report-filing process

Who should I contact if I have any questions?

You can access your employer account online as well as other claims and tax information at www.dws.state.nm.us.

You can also contact a Customer Service Agent in the Unemployment Insurance Operations Center at 1-877-664-6984, Monday through Friday from 8:00 a.m. to 4:30 p.m.

Documents to download

Categories

  • Do you want to become an

    Applications Developer?

    Develop, create, and modify general computer applications software or specialized utility programs. Analyze user needs and develop software solutions. Design software or customize software for client use with the aim of optimizing operational efficiency.

  • Do you want to become a

    Plumber?

    Assemble, install, alter, and repair pipelines or pipe systems that carry water, steam, air, or other liquids or gases. May install heating and cooling equipment and mechanical control systems.

  • Do you want to become an

    Ironworker?

    Raise, place, and unite iron or steel girders, columns, and other structural members to form completed structures or structural frameworks. May erect metal storage tanks and assemble prefabricated metal buildings.

  • Do you want to become an

    Electrician?

    Perform preliminary work with the material and tools of the trade; residential and commercial rough wiring and finish work including the installation of various kinds of wires, cables, and conduits per the National Electrical Code; industrial lighting and service installation; motors controls and installation including emergency generators, relays, and timing devices.

Can't find what you're looking for?

Contact us and we'll do our best to answer your questions.